日韩手机在线观看视频 I 人人妻人人狠人人爽天天综合网 I 中文字幕黄色片 I 中文字幕无码免费不卡视频 I 久久国产亚洲精品 I 精品一区二区免费 I 婷婷色怡春院 I 天天操中文字幕 I 天天综合网在线观看视频 I 人妻激情偷乱一区二区三区 I 无码人妻丰满熟妇区10p I 黄页网站在线看 I 色视频www在线播放国产人成 I 国产一级网站 I 91视频播放器 I 三级黄色在线视频中文 I av无码播放一区二区三区 I 人妻少妇乱孑伦无码专区蜜柚 I 国语对白在线播放 I 国产亚洲精品一区二三区 I 一道本在线播放 I 99视频在线观看视频 I 欧美三级午夜理伦三级小说 I 成人av免费网址 I 亚洲人体一区 I 青青青国产在线观看免费 I 蜜桃av一区二区 I 少妇肉麻粗话对白视频 I 亚洲精品99久久久久中文字幕 I 丁香婷婷亚洲综合 I 国产啪精品视频网站丝袜 I 日本白嫩的bbw I 中文字幕视频在线看 I 激情不卡一区二区三区视频在线 I 久久久久久久高潮

Hunan Purification Engineering: Several points to pay attention to when designing a purification workshop

2024-08-12 2832

Planning a purification workshop is not as easy as imagined. It is a large project that requires a significant amount of energy consumption, with air conditioning being the most energy intensive component. Therefore, in planning and construction, attention should be paid to energy-saving measures, system and regional division, air volume calculation, and determination of temperature and relative humidity. Consider self-control equipment in this requirement to ensure full process regulation of the purification workshop; Select air conditioning units based on climate conditions; And the air conditioning room should be planned on the side of the clean room, which can not only save energy but also make the airflow organization more reasonable.

1. Air purification engineering air planning system

The indoor air purification system of the purification workshop planning project can be divided into horizontal laminar flow, straight laminar flow, and turbulent flow. The selection of airflow mode should refer to the conventional method and depend on the operating parameters of the room.

2. Cleanliness and air exchange rate

The cleanliness of a workshop is primarily determined by the number of air changes per unit time. Therefore, before determining the technical parameters of the purification system, careful consideration should be given to the nature of the workshop's operations and production requirements.

湖南凈化工程

3. Purification workshop structure

In order to ensure that the airflow is almost undisturbed, it is necessary to plan according to the combination period, and caution can be taken to avoid dust accumulation in any part of the purification workshop planning engineering room.

4. Purification workshop scheme planning

Before determining the planning scheme, it is necessary to carefully consider the nature of the workshop's operations and airflow conditions. Purification workshops with high dust emissions should not use ground air supply. Cleanrooms with high cleanliness requirements should avoid other workshops as much as possible.

5. Requirements for Purification Workshop Information

As ceiling, wall, and floor materials require materials that are not prone to cracking, particles, or dust. In addition, depending on the different working conditions in the workshop, the stability of the chemical properties of the data should also be considered.

6. Pressure and airflow

Purification engineering aims to prevent polluted air from entering the indoor environment, while maintaining positive pressure indoors to achieve the desired outcome. In order to obtain the required indoor pressure, it is necessary to increase the appropriate amount of fresh air.

7. Produce auxiliary equipment for purification workshop

If necessary, install some auxiliary equipment such as air indicators for fresh air vents, transmission windows on partitions, etc. The equipment requirements meet the requirements of the workshop.

8. Human and object dust control

People and objects are the primary sources of dust, so manipulation is necessary. For example, when entering the purification workshop, everyone should go through the purification system, replace dust-free clothes, and receive basic education on the functions of the purification system.

9. Water supply, drainage, gas supply equipment, and power supply

According to the planned operation of the purification workshop, drainage equipment, air supply equipment, and power supply should be provided. These equipment and the equipment touched should be easy to use and plan, and should not hinder the air purification system.

In the planning process of the purification workshop, the above points should be taken into account based on the actual situation of the project and the specific requirements of the customer. Attention should be paid to the clean production area, including personnel purification, material purification, air conditioning purification rooms, and other operational and auxiliary rooms and facilities, as well as the space required for various process pipelines and lines.