日韩手机在线观看视频 I 人人妻人人狠人人爽天天综合网 I 中文字幕黄色片 I 中文字幕无码免费不卡视频 I 久久国产亚洲精品 I 精品一区二区免费 I 婷婷色怡春院 I 天天操中文字幕 I 天天综合网在线观看视频 I 人妻激情偷乱一区二区三区 I 无码人妻丰满熟妇区10p I 黄页网站在线看 I 色视频www在线播放国产人成 I 国产一级网站 I 91视频播放器 I 三级黄色在线视频中文 I av无码播放一区二区三区 I 人妻少妇乱孑伦无码专区蜜柚 I 国语对白在线播放 I 国产亚洲精品一区二三区 I 一道本在线播放 I 99视频在线观看视频 I 欧美三级午夜理伦三级小说 I 成人av免费网址 I 亚洲人体一区 I 青青青国产在线观看免费 I 蜜桃av一区二区 I 少妇肉麻粗话对白视频 I 亚洲精品99久久久久中文字幕 I 丁香婷婷亚洲综合 I 国产啪精品视频网站丝袜 I 日本白嫩的bbw I 中文字幕视频在线看 I 激情不卡一区二区三区视频在线 I 久久久久久久高潮

How to effectively utilize the air conditioning system in the purification workshop of Hunan Purification Engineering Analysis

2023-11-27 1673

The energy consumption of HVAC system accounts for about 60% of building energy consumption, so energy conservation of HVAC is particularly important in building energy conservation. The purification air conditioning system in the purification workshop is more chaotic and requires higher investment compared to general air conditioning systems, mainly reflected in factors such as large air supply volume, high fan pressure loss, high cooling and heating loads, and constant temperature and humidity requirements for clean air conditioning. Make the operating energy consumption of the purification air conditioning system about ten times higher than that of the general air conditioning system, adding the cost of producing products for factories and enterprises. Therefore, in the case of satisfying the production needs of high-precision products in enterprises and meeting professional production quality management standards, choosing energy-saving solutions for purification air conditioning systems will greatly reduce the operating costs of enterprises.

Firstly, let's understand the characteristics of the air conditioning system in the purification workshop (which is also the primary component of clean air conditioning energy consumption).

1: High air volume and high fan pressure head. The purification workshop achieves cleanliness standards by circulating and filtering sufficient air volume. The air volume is generally calculated based on the number of indoor air changes, usually 10 times or even dozens of times the volume of the room, especially in one-way flow cleanrooms such as Class 100 and Class 10, where the air change rate reaches several hundred times the volume of the room. The purified air volume is filtered through primary, secondary, and tertiary filters and transported to the workshop through longer air ducts, overcoming the resistance of other equipment and accessories in the system, resulting in a pressure loss of approximately 1000Pa. So if the air handling unit needs to supply such a large pressure head, it requires a matching power supply for power.

2: High temperature and humidity control requirements. The requirement for constant temperature and humidity in the purification workshop is to meet the production needs of the process. For example, in the manufacturing of certain electronic products, the control requirements for temperature and humidity are very strict. In medical and experimental animals, there are also clear requirements for the accuracy of temperature and humidity control. In order to achieve constant temperature and humidity, it is required that the air handling unit has at least cooling, heating, humidification, dehumidification and other functional sections, and requires precise control; Moreover, the water flow rate should be controlled using integral control, and the humidification amount should also be controlled using integral control or PID regulation to achieve higher control accuracy.

3: The air conditioning system has a high cold and hot load. Because there are many production equipment, high equipment power, and large heat dissipation in general purification workshops; The second compensation requires a large amount of fresh air for indoor exhaust and maintaining positive pressure values; Third protection structure heat dissipation and production personnel heat dissipation loads; So the cooling and heating load of the air conditioning system in the purification workshop is much higher than that of general air conditioning, and the planning and operation energy consumption of adding refrigeration equipment.

By understanding the primary part of energy consumption in the air conditioning system of a purification workshop, one can start from these reasons and develop energy-saving measures that are suitable for different levels of purification workshops, production environments, and production process requirements. The following energy-saving methods are proposed for analysis.

湖南凈化工程

1: Select lower cleanliness levels and air exchange rates under satisfactory production process requirements.

The customer and the planning and construction party need to communicate and confirm this requirement, and select the environmental requirements that are suitable for the production of their own products. It does not mean that the higher the purification level, the better, as it corresponds to high investment and high energy consumption operation. In addition, some suppliers of the same level of purification workshops, due to a lack of experience, blindly follow the planning standards for air exchange rates and often achieve higher air exchange rates. For example, the standard air exchange rate for static clean 10000 level workshops is 15-25 times/h. This range is only a reference value for our planning. If we do not take into account the customer's product production process and environmental factors, blindly select higher air exchange rates, although it meets the purification requirements, it adds investment and operating power. Therefore, the service we provide to our customers is to meet the production needs of the process, select the appropriate cleanliness level and air exchange rate, and provide energy-saving purification system solutions.

2: Separate the purified air volume from the air volume that satisfies the cooling and heating load of the air conditioner.

For workshops with higher purification levels, such as those with purification levels of 1000, 100, and higher; Perhaps workshops with larger areas and higher floors require much higher purification air volume than the air conditioning supply required to meet satisfactory temperature and humidity requirements. If the purified air volume is selected as the air conditioning air volume together, that is, if the purified air volume and the air conditioning air volume are not separated, then all the return air must be collected and processed through the combined air cabinet. When a large air volume passes through the air treatment equipment, the resistance will be high, and the energy consumption of the fan will increase. Together, in order to dehumidify, all return air must be treated to the dew point state, and then in order to prevent the indoor temperature from being too low, it is necessary to reheat the supply air. Cold and heat offset, causing unnecessary waste. If the air conditioning and purification air volumes are treated separately, the purification air volume will only be filtered, which can greatly shorten the length of the purification air volume transportation pipeline; As for the air conditioning airflow, reducing the airflow can save on air cooling and heat treatment, and also reduce the transportation cross-section and energy consumption. As shown in Figures 2 and 3.

3: Reduce the loss of fresh air volume.

In the air conditioning system of the purification workshop, the fresh air load accounts for a large proportion. Therefore, reducing the fresh air volume is of great significance for reducing the energy consumption of the clean air conditioning system. The fresh air volume in the purification workshop is primarily determined by the exhaust volume and the fresh air required to maintain positive indoor pressure. To reduce the fresh air volume of the system, the first priority is to reduce the exhaust air volume of the system. In IC factories, various toxic and harmful gases are generated due to the use of acids, bases, and organic solvents in semiconductor production. Therefore, the exhaust hood of the device may directly exhaust the equipment, using a local exhaust method with a small air volume to control the dispersion of harmful gases and discharge them outdoors. Thus reducing the amount of supplementary fresh air. The second point is to reduce the leakage of workshop air flow. Maintaining positive air flow is related to the controlled pressure difference and sealing of the clean room. The pressure difference is primarily determined by the nature and standards of the clean room, therefore, in order to reduce and maintain positive air pressure, the sealing of the system should be improved first. In this regard, strict control should be exercised over the sealing of the clean room during the planning and construction process, such as reducing the number of doors and windows, ensuring that doors and windows have outstanding sealing functions (such as adding sealing strips under doors), and closing doors entering and exiting the clean room in a timely manner; Methods for controlling the bonding degree of color steel plate joints and the quality of adhesive sealing technology during the construction process, as well as sealing the voids through the color plate.

4: Reasonable selection of air conditioning system equipment.

The unit cooling load of the purification workshop is several to ten times higher than that of general comfort air conditioning. In addition to dealing with relatively large purification air volume factors, another primary factor is that workshop equipment has a large heat dissipation capacity, including production equipment heat dissipation, combined air conditioning equipment heat dissipation, FFU and other air conditioning equipment heat dissipation, and lighting heat dissipation. Therefore, a large amount of cooling capacity is required. In this regard, the required cooling load for the workshop should be carefully calculated. Through detailed communication with the customer, specific equipment power and quantity should be obtained to accurately calculate the cooling load. To prevent unrealistic and blindly increasing the cooling capacity of the workshop's air conditioning, and to increase the investment in air conditioning equipment in the early stage and the waste of surplus in the later stage, and to increase the energy consumption and operating costs of air conditioning. Similarly, regarding the standard calculation of the head and air pressure of the water pump and fan in the air conditioning system, the first priority is to plan and arrange the water system and air duct system reasonably, and minimize pipeline resistance as much as possible. Secondly, accurate hydraulic calculation of the water system and air duct system is required to obtain accurate pump lift and fan pressure head, to prevent excessive head and pressure head and increase operating costs.

In summary, the factors causing energy loss in the purification workshop cover all aspects. We not only need to start from the source and provide precise and suitable purification system solutions for customer enterprises, but also need to improve construction quality, optimize the construction process, and flexibly select energy-saving construction plans according to local conditions during the construction process; Moreover, in order to provide professional training on the operation and protection of purification systems for enterprises in the later stage, enterprises can adopt correct protection and application methods, which is conducive to saving workshop energy loss and reducing production costs. With the rapid development of China's technology industry, more and more purification workshops have emerged. Energy saving air conditioning systems in purification workshops have become an important means for manufacturers to reduce production costs, increase competitive advantages, and defeat opponents. Therefore, energy conservation of clean air conditioning systems has become a hot topic in our research and a focal point of concern for enterprises.

Article source: Hunan Purification Engineering http://www.xwsk.com.cn/


主站蜘蛛池模板: 鲁一鲁影院 | 欧美一级片免费看 | 97人妻天天摸天天爽天天 | gogo全球大胆高清人露出91 | 欧美怡红院免费全部视频 | 日韩精品一区二区三区第95 | 一区二区三区 日韩 | 日韩视频观看 | 羞羞视频免费网站在线看 | 夜夜欢性恔免费视频 | 色资源av中文无码先锋 | 午夜视频免费国产在线 | 漂流教室韩国电影 | 欧美午夜精品一区二区三区电影 | 成人日韩在线观看 | 成年免费视频黄网站zxgk | 人妻熟妇乱又伦精品视频中文字幕 | 久久99成人免费 | 亚洲精品无码久久久久sm | 日本高清视频www夜色资源 | 精品一区二区三区四区五区 | 国产在线精品一区二区三区直播 | 波多野结衣办公室在线 | 无码av动漫精品一区二区免费 | 色吊丝国产 | 日本在线观看免费视频 | 亚洲精品不卡 | 视频一区 中文字幕 | 精品美女在线观看视频在线观看 | 一个色综合亚洲伊人久久 | 97青青青国产在线播放 | 国产激情免费视频在线观看 | 精品少妇爆乳无码av无码专区 | 成人精品一区二区三区 | 18禁男女爽爽爽午夜网站免费 | 浪潮av激情高潮国产精品 | 亚洲成色www久久网站 | 4hu四虎永久在线观看 | 日本高清动作片www网站免费 | 久久视频在线视频 | 精品伊人久久久99热这里只 | 天天碰天天操 | 国产午夜成人久久无码一区二区 | 求av网站 | 国产精品久久福利网站 | 日韩欧美亚洲国产精品字幕久久久 | 丰满少妇三级全黄 | 粗大的内捧猛烈进出在线视频 | 全部av―极品视觉盛宴 | 少妇一边呻吟一边说使劲视频 | 毛片免费在线观看 | 午夜电影网va内射 | 伊人久久大香线蕉无码 | 亚洲综合精品一区二区三区中文 | 欧美亚洲国产色综合 | 久久99精品国产.久久久久 | 色综合久久久久无码专区 | 亚洲精华国产精华精华液网站 | 亚洲精品手机在线 | 少妇高潮尖叫黑人激情在线 | 精产国产伦理一二三区 | 亚洲日韩精品AV无码富二代 | 久久久久成人精品亚洲国产 | 看片免费黄| 精品久久久久久中文字幕大豆网 | 国产成人无码一区二区在线播放 | 91短视频网址 | 2020无码专区人妻系列日韩 | 嘿咻嘿咻免费区在线观看吃奶 | 4hc44四虎www在线影院男同 | 日日噜噜夜夜狠狠va视频 | 日本高清在线看片免费视频 | 精品一二三区久久aaa片 | 亚洲福利一区 | 538亚洲欧美国产日韩在线精品 | 国产成人精品视频网站 | 精品久久久久久久久久久国产字幕 | 国产a区 | 久久最新精品 | 亚洲色图3p| 强奷乱码欧妇女中文字幕熟女 | 日本免费视频 | 国产成年无码久久久久毛片 | 男受被做哭激烈娇喘gv视频 | 中文区中文字幕免费看 | 啪啪在线看 | 一级黄色大片 | 粗了大了 整进去好爽视频 粗壮挺进人妻水蜜桃成熟漫画 | 国产成a人片在线观看视频下载 | 女人和拘做爰正片视频 | 曰韩人妻无码一区二区三区综合部 | 国产精品岛国久久久久久久 | 天天草夜夜骑 | 亚洲国内精品 | 午夜寂寞影院在线观看 | 免费无遮挡无码永久在线观看视频 | 一本色道精品久久一区二区三区 | 在线观看的av网站 | 亚洲精品国产成人 |