日韩手机在线观看视频 I 人人妻人人狠人人爽天天综合网 I 中文字幕黄色片 I 中文字幕无码免费不卡视频 I 久久国产亚洲精品 I 精品一区二区免费 I 婷婷色怡春院 I 天天操中文字幕 I 天天综合网在线观看视频 I 人妻激情偷乱一区二区三区 I 无码人妻丰满熟妇区10p I 黄页网站在线看 I 色视频www在线播放国产人成 I 国产一级网站 I 91视频播放器 I 三级黄色在线视频中文 I av无码播放一区二区三区 I 人妻少妇乱孑伦无码专区蜜柚 I 国语对白在线播放 I 国产亚洲精品一区二三区 I 一道本在线播放 I 99视频在线观看视频 I 欧美三级午夜理伦三级小说 I 成人av免费网址 I 亚洲人体一区 I 青青青国产在线观看免费 I 蜜桃av一区二区 I 少妇肉麻粗话对白视频 I 亚洲精品99久久久久中文字幕 I 丁香婷婷亚洲综合 I 国产啪精品视频网站丝袜 I 日本白嫩的bbw I 中文字幕视频在线看 I 激情不卡一区二区三区视频在线 I 久久久久久久高潮

What are the acceptance standards for air conditioning systems in Hunan Purification Engineering

2023-01-07 2450

Regarding a newly built cleanroom purification project that requires a comprehensive inspection of the workshop after completion, we need to clean the entire workshop thoroughly before the inspection. Poor cleanliness and hygiene have a direct impact on the cleanliness inspection.

How should the cleaning inspection of the air conditioning system in the cleanroom purification project be carried out?

1. It is essential to conduct a comprehensive and thorough cleaning of the clean room before debugging. Thoroughly, comprehensively, and thoroughly clean the floors, walls, ceilings, doors, and windows of the cleanroom (preferably with a professional cleaning company); Inspect, leak detect, and wipe air conditioning equipment, air conditioning ducts (supply air ducts, return air ducts, fresh air ducts), and air conditioning accessories (silencers, valves, air vents, etc.). Terminate the requirement for cleanliness upon arrival.

2. Perform the first air blow on the coarse and medium efficiency filters of the equipment. On the basis of thorough cleaning, the coarse and medium filters inside the equipment air conditioner are installed. Perform air blowing on the entire purification air conditioning system for 24-36 hours to initiate the purification process.

湖南凈化工程

3. Efficient filter for equipment. The system can install high-efficiency filters after air blowing. Before installing the high-efficiency filter, it is required to perform leak detection on each one and seal any leaks. Leak detection is carried out on a temporary leak detection platform, and atmospheric dust is used as the dust source. Only high-efficiency filters that have passed the inspection can be used for equipment. After the equipment is completed, the equipment of the high-efficiency filter should be sealed and leak checked (using a dust particle counter to scan) until the equipment is qualified.

4. After the leak detection of the high-efficiency filter equipment is qualified, the purification air conditioning system will be air blown for the second time. The air blowing time is 24 hours before entering the debugging program.

After the cleaning inspection of the project, the entire project can be delivered to the customer for use.

Article source: Hunan Purification Engineering http://www.xwsk.com.cn/